BLACK BEAR DEVELOPMENT
PWS ID: NC1056031 · NEBO, North Carolina 28761
BLACK BEAR DEVELOPMENT serves 343 people in NEBO, North Carolina using Groundwater water sources. It has 2 recorded EPA violations, including 0 health-based violations. No PFAS contamination was detected in UCMR5 testing.
Water Quality Snapshot: BLACK BEAR DEVELOPMENT
BLACK BEAR DEVELOPMENT is a private-owned community water system that delivers drinking water to 343 residents in NEBO, North Carolina (McDowell County) through 135 service connections. Its water is drawn from groundwater sources. EPA's Safe Drinking Water Information System records 2 total violations for this system , of which 0 (0%) are health-based — meaning a contaminant exceeded an EPA Maximum Contaminant Level or a required treatment technique failed. A further 1 monitoring and reporting violations are on file. The most recent violation on record dates to 2022.
The most frequently cited contaminant at this system is Lead and Copper Rule, recorded in 1 violation (MR). This system has not yet been sampled under EPA's UCMR5 PFAS monitoring program, so no PFAS detection data is available here.
Across North Carolina, EPA tracks 5,020 public water systems serving 9,877,724 people, with 524,053 cumulative violations and 38,492 health-based violations on record. About 93% of systems in the state carry at least one violation, and state-wide the average per system is 104.4 violations. BLACK BEAR DEVELOPMENT's 2 violations sit below the North Carolina average. Statewide, 174 of 287 UCMR5-tested systems have reported PFAS detections (60.6%). All figures above are sourced directly from EPA SDWIS and UCMR5 public data releases and are updated as EPA publishes new reporting cycles.
System Details
- System Type
- Community
- Owner Type
- Private
- Connections
- 135
- County
- McDowell
- School/Daycare
- No
- MCL Violations
- 0
- Monitoring Violations
- 1
- Treatment Tech Violations
- 0
Violation History
Contaminant violations recorded by EPA.
| Contaminant | Category | Count | Latest |
|---|---|---|---|
| Lead and Copper Rule | MR | 1 | 2022 |
| Consumer Confidence Rule | Other | 1 | 2020 |
Verify This Water System
The figures above are aggregated from EPA's public databases. To verify the underlying records — or to file a complaint, request a Consumer Confidence Report, or check current monitoring status — go directly to the federal and state regulators that enforce the Safe Drinking Water Act for BLACK BEAR DEVELOPMENT.
EPA SDWIS — Federal Reports
EPA's Safe Drinking Water Information System (SDWIS) holds the federal compliance record for every regulated public water system. Open the system-level report by PWS ID:
View PWS ID NC1056031 on SDWISSource: EPA SDWIS Federal Reports Search
North Carolina Drinking Water Authority
North Carolina DEQ — Public Water Supply Section is the primacy agency that licenses and inspects BLACK BEAR DEVELOPMENT under EPA-delegated authority.
Open NC regulator portalViolation Timeline
Each row links to the EPA SDWIS public record for verification. Cross-reference the contaminant code on EPA's federal report to see violation dates, return-to-compliance status, and enforcement actions.
| Year (latest) | Contaminant | Category | Count | EPA Record |
|---|---|---|---|---|
| 2022 | Lead and Copper Rule | MR | 1 | SDWIS / NC1056031 / 5000 |
| 2020 | Consumer Confidence Rule | Other | 1 | SDWIS / NC1056031 / 7000 |
How BLACK BEAR DEVELOPMENT Compares
Cross-reference this system's record against state averages and the federal MCL framework for context.
| Metric | BLACK BEAR DEVELOPMENT | North Carolina avg | Federal benchmark |
|---|---|---|---|
| Total violations | 2 | 104.4 | SDWA compliance — any non-zero count is a recorded breach |
| Health-based violations | 0 | 7.7 | Indicates a contaminant exceeded a federal MCL |
| PFAS detection | None | 60.6% | EPA final rule (2024): PFOA/PFOS MCL = 4.0 ppt |
| Population served | 343 | 1,968 | Sizing context for compliance burden |
Sources: EPA SDWIS and EPA National Primary Drinking Water Regulations (40 CFR Part 141). State averages computed across 5,020 regulated public water systems in North Carolina.
Federal MCL reference — Safe Drinking Water Act thresholds ▼
| Contaminant | Federal MCL / Action Level | Note |
|---|---|---|
| Lead | 0 mg/L (Action Level: 0.015 mg/L) | Lead and Copper Rule treatment technique |
| Arsenic | 0.010 mg/L (10 ppb) | Health-based MCL since 2006 |
| Total Coliform | Treatment technique (RTCR) | Indicator organism, monitoring trigger |
| PFOA / PFOS (PFAS) | 4.0 ppt each (final 2024 rule) | Compliance deadline 2029 |
| Nitrate (as N) | 10 mg/L | Acute health risk for infants |
Frequently Asked Questions
Is BLACK BEAR DEVELOPMENT water safe to drink? ▼
How many people does BLACK BEAR DEVELOPMENT serve? ▼
What type of violations does BLACK BEAR DEVELOPMENT have? ▼
Has PFAS been detected in BLACK BEAR DEVELOPMENT water? ▼
What water source does BLACK BEAR DEVELOPMENT use? ▼
Where does this data come from? ▼
Explore PlainWater
Related Data for North Carolina
Read our methodology — how this data is sourced, computed, and verified.